Takeda Primary Photo

Takeda

Cambridge, MA

Office, Science/Tech

Integrated at Work (IAW) completed fit-out at Takeda’s 12-story, 343K SF headquarters and lab facility in Kendall Square. Supporting Takeda’s vision, IAW provided design assistance, product specification, installation, and project and budget management for the expansion project – all within an accelerated timeline.

The project scope included the installation of demountable walls and telescoping glass doors for modular offices, a full glass and glazing package, and sound masking (scroll below for specifics).

Additionally, IAW’s affiliate Environments at Work, outfitted the interior with furnishings including workstations and shared amenity spaces to accommodate 840 employees.

4,590 LF

Products
Glass & Glazing Package, Haworth Demountable Walls; Muraflex Glass Doors, Lencore Soundmasking
General Contractor
Lee Kennedy
Architect
Symmes Maini & McKee and PBD (Partners By Design)
Photography
courtesy image; IAW

contact us to learn more

Demountable Walls

  • 12 floors / 2 Phases
  • 4,590 LF
  • 144 Pivot Doors / 83 Sliding Doors
  • Haworth Enclose, EFG 2-Channel, Trivati
  • Specials included power base AI electrical, future locking functionality w/ blank cores in interim, and entryway doors with auto openers and touchless actuators

Glass & Glazing

  • Glass Sidelites at Interior/Exterior Mullions
  • All-Glass Entry Door w/Auto Opener
  • Mirrors
  • Doorlites
  • Turnstile Glass Guardrails
  • Muraflex Telescoping Walls
  • Phone Room Doors
  • Glass Window Units
  • STC-rated Window
  • CRL Daisy Sliding Window
  • AGS Storefront Window

Soundmasking

  • 11 Floors
  • 909 Sound Masking Units
  • 20 Power Supply Units
  • 42 Platform Control Units
  • Product: Lencore Spectra i.Net System