The Hub on Causeway Primary Photo

The Hub on Causeway

Boston, MA

Office, Hospitality/Retail

The demountable wall installation in the 11th Floor Spec Suites at The Hub on Causeway was successful in delineating separate areas within the space, enhancing functionality, and improving its overall aesthetic appeal. The project demonstrated effective collaboration among the general contractor, architect, developer, and Integrated at Work (IAW), resulting in a space that effortlessly meets design expectations.

Solutions/Scope:

  • Installed 515 LF of low-profile glass demountable doors and walls.
  • Installed 4 suites; entire scope completed over 2 weeks.
  • Both regular time (RT) and overtime (OT) hours were utilized strategically to meet the customer’s specific timeline and requirements.
  • IAW’s partner, Johnson & Goglia Contracting, Inc., carried out the installation process with quality and precision.

 

Products
Demountable Walls
General Contractor
Columbia Construction
Architect
Stantec
Developer
BXP
Photography
IAW