Aetna Primary Photo

Aetna

Wellesley, MA

Office

Integrated at Work (IAW) was excited to help create this beautiful space for Aetna’s marketing and communications team.

IAW selected and sourced products from a variety of manufacturers to support the “resimercial” (residential-commercial) design vision. Examples include glazing and entryway doors by Oldcastle; mirrors from Division 9, Restoration Hardware, and Wayfair; and whiteboards from Claridge. Sleek, Haworth Enclose Frameless Glass demountable walls allow natural light to flood the space.

The project was completed within an aggressive schedule due to the great working partnership among IAW, the GC team (Suffolk), and the installation team (Johnson & Goglia). 

Noteworthy: IAW installed just under 1,000 LF (exactly 985 LF) of demountable walls and installed these walls on top of 56,865 SF of raised access flooring throughout the entire space.

Products
Raised Access Flooring, Demountable Walls, Glazing, Mirrors, Entryway Doors
General Contractor
Suffolk Construction
Architect
Elkus Manfredi
Photography
Connie Zhou; Integrated at Work
Santander Bank Primary Photo

Santander Bank

Various: Mid-Atlantic States

Office, Hospitality/Retail

Integrated at Work (IAW) and its affiliate Environments at Work (EAW) have successfully partnered with Santander since January 2019 to complete 20+ retail banking branches in Massachusetts, New York, New Jersey, and Pennsylvania.

Banking offices are designed using Haworth’s Enclose demountable wall systems as a standard. The walls feature both pivot and sliding doors in their design depending on the branch’s specific requirements.

In addition to installing retail branches, the IAW/EAW team worked in conjunction with CBRE to build out Santander’s first U.S. Work Café located in Brooklyn, NY, The innovative branch concept offers free co-working spaces and meeting rooms for customers and non-customers to support local businesses and entrepreneurs.

Products
Demountable Walls, Pivot & Sliding Doors
General Contractor
Various
Architect
Gensler
Photography
IAW
Martha’s Vineyard Hospital Primary Photo

Martha’s Vineyard Hospital

Oak Bluffs, MA

Office, Healthcare

As part of an addition to the hospital, Integrated at Work (IAW) supplied approximately 400SF of ½’’ clear tempered glass along with an aluminum entry system. IAW provided an Oldcastle butt joint glazing system to construct a glass vestibule along with glass dividers and also partnered with Architectural Glazing Systems who fabricated the aluminum entry system. The entry system was coordinated with the automatic operator to ensure proper mounting and functionality.

Considering the project location on Martha’s Vineyard and a quick installation timeframe, it was imperative that all materials be on-site and ready for install. The IAW project manager visited the site prior to the installation start date to verify all product was correct and aided the general contractor team with wall layout and detail coordination. This preparation, attention to detail, coordination, and clear communication with the GC resulted in an extremely smooth installation that was completed sooner than required within the client’s scheduled timeframe.

Products
Conventional Glass
General Contractor
Columbia Construction
Architect
Thomas, Miller & Partners, LLC
Takeda Primary Photo

Takeda

Cambridge, MA

Office, Science/Tech

Integrated at Work (IAW) completed fit-out at Takeda’s 12-story, 343K SF headquarters and lab facility in Kendall Square. Supporting Takeda’s vision, IAW provided design assistance, product specification, installation, and project and budget management for the expansion project – all within an accelerated timeline.

The project scope included the installation of demountable walls and telescoping glass doors for modular offices, a full glass and glazing package, and sound masking (scroll below for specifics).

Additionally, IAW’s affiliate Environments at Work, outfitted the interior with furnishings including workstations and shared amenity spaces to accommodate 840 employees.

4,590 LF

Products
Glass & Glazing Package, Haworth Demountable Walls; Muraflex Glass Doors, Lencore Soundmasking
General Contractor
Lee Kennedy
Architect
Symmes Maini & McKee and PBD (Partners By Design)
Photography
courtesy image; IAW

contact us to learn more

Demountable Walls

  • 12 floors / 2 Phases
  • 4,590 LF
  • 144 Pivot Doors / 83 Sliding Doors
  • Haworth Enclose, EFG 2-Channel, Trivati
  • Specials included power base AI electrical, future locking functionality w/ blank cores in interim, and entryway doors with auto openers and touchless actuators

Glass & Glazing

  • Glass Sidelites at Interior/Exterior Mullions
  • All-Glass Entry Door w/Auto Opener
  • Mirrors
  • Doorlites
  • Turnstile Glass Guardrails
  • Muraflex Telescoping Walls
  • Phone Room Doors
  • Glass Window Units
  • STC-rated Window
  • CRL Daisy Sliding Window
  • AGS Storefront Window

Soundmasking

  • 11 Floors
  • 909 Sound Masking Units
  • 20 Power Supply Units
  • 42 Platform Control Units
  • Product: Lencore Spectra i.Net System
Brigham Building of the Future (BBF) Primary Photo

Brigham Building of the Future (BBF)

Boston, MA

Office, Healthcare

Integrated at Work (IAW) completed this 7-floor installation of Haworth demountable walls to separate lab and office space at Brigham and Women’s Hospital’s innovative construction and state-of-the-art research space at BBF.

Unique aspects and challenges of the project included:

  • Glass wall used to divide lab space from office corrals included a large piece of specialty laminated glass
  • Redesign of base track specifically for this project
  • Building logistics for deliveries
  • Accelerated install
Products
Haworth Demountable Walls
General Contractor
Suffolk Construction
Architect
NBBJ
Photography
Integrated at Work
Brigham & Women’s Hospital Primary Photo

Brigham & Women’s Hospital

Boston, MA

Office, Healthcare

Integrated at Work (IAW) is proud of a continuing partnership with Brigham & Women’s Hospital (BWH) and has completed projects within their campus – from hospital laboratory spaces to administrative support spaces, offsite offices, and outpatient centers. Projects varied in scope and range of product application.

Some recently completed projects include:

  • Hale Building for Transformative Medicine
  • Thorn Building HHMI Conference Room
  • Graduate Medical Education Office
  • Primary Care Associates at 1 Brookline
  • Neville House/Occupational Health Services
  • Family Care Associates
Product
Demountable Walls, Glass & Glazing
General Contractor
Suffolk Construction
Architect
Various
Photography
Integrated at Work

IAW has specified and installed a wide range of product solutions, including Haworth Enclose Walls, Wilson Partitions, Klein Rollglass Walls, and Oldcastle Glazing with U-channel.  For each project, IAW’s team successfully managed variations to hold-to dimensions, aggressive schedules, and security clearance with hospital accessibility.

University of Rhode Island Primary Photo

University of Rhode Island

Kingston, RI

Office, Education

Integrated at Work (IAW) delivered a complete glass wall system with doors and sliding doors for the University’s newly constructed College of Engineering. The 190,000 SF building is the largest construction project in the University’s history. The single, six-floor building replaces five older buildings on the University’s engineering campus.

Creating light-filled expanses of open space for the state-of-the-art classrooms and laboratories was key. To help achieve this, IAW installed a 12’0” high glass wall in an area on the building’s first floor.

Products
Nello Clarity Glass Wall System, Doors, Frames and Hardware
Contractor
Dimeo Construction
Architect
Ballinger Philadelphia
Photography
Nora Lewis; Integrated at Work
Cape Cod 5 Primary Photo

Cape Cod 5

Hyannis, MA

Office

Integrated at Work (IAW) installed both a sound masking system (38,200 SF) and a raised flooring system (6,100 SF) as part of Cape Cod 5’s new banking center and headquarters built to accommodate 300+ employees.

After reviewing the space and speech privacy requirements, IAW provided a layout optimizing the correct level of ambient sound for space. Additionally, IAW incorporated a paging system into the sound masking system to provide cost savings to the client versus providing each system separately.

Cape Cod 5’s project requirements included a need for flexibility and accessible power and data locations in the large assembly room.  The TecCrete raised flooring offered a great solution that offered a solid walking sensation along with the ultimate flexibility.

Implementing green design and building features were a priority. Cape Cod 5’s project achieved LEED Gold certification.

Learn more about this great project.

Products
Soft DB Sound Masking, Global IFS Raised Access Flooring
Contractor
Delbrook | JKS
Architect
Catalyst Architecture and Interiors
Photography
courtesy photo (above)
Deciphera Primary Photo

Deciphera

Waltham, MA

Office, Science/Tech

Integrated at Work delivered a raised access flooring system as the first phase of Decipera Pharmaceuticals’ expansion project. The Tecrete raised floor system elevated a separate workspace in the center of the office to allow for increased privacy. IAW specified 7,800 SF of the TecCrete 1250 panel system which provides the rigidity and stability to meet the needs of this demanding and flexible workspace.

IAW worked simultaneously under a fast-track schedule with the trades and contractors on site. Though the site was not fully built-out, IAW successfully prepared the railing production and flooring installation. Since the construction schedule dictated installation in phases, IAW was able to visualize the remaining installation by calculating and analyzing exactly how much material was needed. Additionally, our team installed the RAF and railing system without affecting furniture installation.

A unique aspect of this project was a back-lit through integrated as part of the raised floor system.  IAW coordinated this detail with the architect, general contractor, and lighting contractor to achieve the desired lighting effect

Products
Global IFS TecCrete Raised Access Flooring
General Contractor
J. Calnan & Associates
Architect
SGA
Photography
©2020 Ari Burling (photo above); Integrated at Work (other)